LEGO ROBOTICS
  • Home
  • Wormhole Wizards
  • Labyrinth Decoders
  • Team Gallery

Labyrinth Decoders
FLL Team 32288

FLL Hydrodynamics 2017-2018
Filter and Pump Addition mission:

Made by Anne Marie, Leslie, and Alexia

We combined the Pump Addition and Filter mission in one run. We thought that they were the closest and the most similar missions on the table, becuse they both require pushing actions from the robot. We tested and created a program using passive attachments, and without using any extra motors, other than the ones required to move the robot.
Picture

Team 2: Filter and Pipe Removal 

Made By Gerson Lopez
Picture
This is my program and I had a lot of fails while doing this run. I had done the Filter and Pipe Removal missions. It was hard to finish because i had to run my program many times and I almost gave up at one point because how many times i had to try. Well i didn't give up and you should never give up. The Pipe Removal was the hardest part of the run. 

Team 3: Faucet and Filter

Picture
This is our that we, Miguel and Aldo, made. It took a long time and many failures but we made it. It started as just to Faucet mission and we decided to ram in  it and thought that that was not the only mission that we were be able to ram and we did the filter mission. We had lot's of problems but we adjusted them and we came with a covenient program.

Team #3: Water collection

Picture
Picture
Picture
 This is our attempt at doing the Water Collection mission, made by us, Miguel And Aldo. We've done several attempts to do this. Like the other missions, there were many failures at doing this. We used a lego rubberband while doing this mission.

Proudly powered by Weebly
  • Home
  • Wormhole Wizards
  • Labyrinth Decoders
  • Team Gallery